Anant Singh Jain

According to our database1, Anant Singh Jain authored at least 3 papers between 1999 and 2002.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2002
A multi-level hybrid framework applied to the general flow-shop scheduling problem.
Comput. Oper. Res., 2002

2000
New and "Stronger" Job-Shop Neighbourhoods: A Focus on the Method of Nowicki and Smutnicki (1996).
J. Heuristics, 2000

1999
Deterministic job-shop scheduling: Past, present and future.
Eur. J. Oper. Res., 1999


  Loading...