2024
Ann. Oper. Res., July, 2024
Utilising the fuzzy analytic network process technique to prioritise safety challenges in construction projects.
Int. J. Crit. Infrastructures, 2024
2021
Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty.
Int. J. Fuzzy Syst., 2021
A bi-objective simulation-based optimization algorithm for redundancy allocation problem in series-parallel systems.
Expert Syst. Appl., 2021
Simulation-based priority rules for the stochastic resource-constrained net present value and risk problem.
Comput. Ind. Eng., 2021
2020
Comput. Ind. Eng., 2020
2018
Int. J. Fuzzy Syst., 2018
Condition based maintenance policy for series-parallel systems through Proportional Hazards Model: A multi-stage stochastic programming approach.
Comput. Ind. Eng., 2018
2017
RAIRO Oper. Res., 2017
A quadratic reproduction based Invasive Weed Optimization algorithm to minimize periodic preventive maintenance cost for series-parallel systems.
Comput. Ind. Eng., 2017
2016
2015
Three self-adaptive multi-objective evolutionary algorithms for a triple-objective project scheduling problem.
Comput. Ind. Eng., 2015
Multi-stage stochastic mean-semivariance-CVaR portfolio optimization under transaction costs.
Appl. Math. Comput., 2015
2014
A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations.
Comput. Oper. Res., 2014
2013
An efficient simulated annealing algorithm for the redundancy allocation problem with a choice of redundancy strategies.
Reliab. Eng. Syst. Saf., 2013
Resource constrained project scheduling problem with discounted earliness-tardiness penalties: Mathematical modeling and solving procedure.
Comput. Ind. Eng., 2013
2012
A bi-objective model to optimize reliability and cost of system with a choice of redundancy strategies.
Comput. Ind. Eng., 2012
2010
Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint.
J. Comput. Appl. Math., 2010
An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem.
Adv. Eng. Softw., 2010
2009
A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations.
Comput. Oper. Res., 2009
2006
Appl. Math. Comput., 2006