Ali Gharbi
Orcid: 0000-0002-1919-9481
According to our database1,
Ali Gharbi
authored at least 27 papers
between 1998 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2024
Estimation-based production control of manufacturing-remanufacturing systems with uncertain seasonal return and imprecise demand and inventory.
Int. J. Prod. Res., 2024
2023
Integrated control policies of production, returns' replenishment and inspection for unreliable hybrid manufacturing-remanufacturing systems with a quality constraint.
Comput. Ind. Eng., February, 2023
2020
Functional brain changes in the elderly for the perception of hand movements: A greater impairment occurs in proprioception than touch.
NeuroImage, 2020
Maintenance on leasing sales strategies for manufacturing/remanufacturing system with increasing failure rate and carbon emission.
Int. J. Prod. Res., 2020
Production and subcontracting control for an unreliable manufacturing system with setups.
Int. J. Prod. Res., 2020
Joint optimization of production and maintenance strategies considering a dynamic sampling strategy for a deteriorating system.
Comput. Ind. Eng., 2020
2019
Production control of hybrid manufacturing-remanufacturing systems under demand and return variations.
Int. J. Prod. Res., 2019
Production planning of an unreliable hybrid manufacturing-remanufacturing system under uncertainties and supply constraints.
Comput. Ind. Eng., 2019
2018
Quality issue in forecasting problem of production and maintenance policy for production unit.
Int. J. Prod. Res., 2018
Production and replacement policies for a deteriorating manufacturing system under random demand and quality.
Eur. J. Oper. Res., 2018
2017
Set-up and production planning in hybrid manufacturing-remanufacturing systems with large returns.
Int. J. Prod. Res., 2017
Improved preventive maintenance in the framework of forecasting problem under subcontractor constraint.
Int. J. Prod. Res., 2017
2015
Failure-prone manufacturing systems with setups: feasibility and optimality under various hypotheses about perturbations and setup interplay.
Int. J. Math. Oper. Res., 2015
2013
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013
2011
Eur. J. Oper. Res., 2011
2010
J. Intell. Manuf., 2010
2009
On the integrated production, inventory and preventive maintenance problem in manufacturing systems with backorder.
Int. J. Simul. Process. Model., 2009
Optimisation of the control policy for a stochastic remanufacturing system with an unreliable replacement parts supply.
Int. J. Simul. Process. Model., 2009
2008
Proceedings of the Third International Conference on Software Engineering Advances, 2008
2007
Développement d'une politique intégrée de contrôle des taux de production et de maintenance corrective avec diagnostic.
INFOR Inf. Syst. Oper. Res., 2007
2005
Maintenance scheduling and production control of multiple-machine manufacturing systems.
Comput. Ind. Eng., 2005
2004
Comput. Ind. Eng., 2004
A simulation optimization based control policy for failure prone one-machine, two-product manufacturing systems.
Comput. Ind. Eng., 2004
2001
A simulation optimization approach in production planning of failure prone manufacturing systems.
J. Intell. Manuf., 2001
1998
Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, 1998