Ali Gharbi

Orcid: 0000-0002-1919-9481

According to our database1, Ali Gharbi authored at least 27 papers between 1998 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Estimation-based production control of manufacturing-remanufacturing systems with uncertain seasonal return and imprecise demand and inventory.
Int. J. Prod. Res., 2024

2023
Integrated control policies of production, returns' replenishment and inspection for unreliable hybrid manufacturing-remanufacturing systems with a quality constraint.
Comput. Ind. Eng., February, 2023

2020
Functional brain changes in the elderly for the perception of hand movements: A greater impairment occurs in proprioception than touch.
NeuroImage, 2020

Maintenance on leasing sales strategies for manufacturing/remanufacturing system with increasing failure rate and carbon emission.
Int. J. Prod. Res., 2020

Production and subcontracting control for an unreliable manufacturing system with setups.
Int. J. Prod. Res., 2020

Joint optimization of production and maintenance strategies considering a dynamic sampling strategy for a deteriorating system.
Comput. Ind. Eng., 2020

2019
Production control of hybrid manufacturing-remanufacturing systems under demand and return variations.
Int. J. Prod. Res., 2019

Production planning of an unreliable hybrid manufacturing-remanufacturing system under uncertainties and supply constraints.
Comput. Ind. Eng., 2019

2018
Quality issue in forecasting problem of production and maintenance policy for production unit.
Int. J. Prod. Res., 2018

Production and replacement policies for a deteriorating manufacturing system under random demand and quality.
Eur. J. Oper. Res., 2018

2017
Set-up and production planning in hybrid manufacturing-remanufacturing systems with large returns.
Int. J. Prod. Res., 2017

Improved preventive maintenance in the framework of forecasting problem under subcontractor constraint.
Int. J. Prod. Res., 2017

2015
Failure-prone manufacturing systems with setups: feasibility and optimality under various hypotheses about perturbations and setup interplay.
Int. J. Math. Oper. Res., 2015

2013
Manufacturing-Remanufacturing Failure-Prone Systems under Random Demands.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

2011
Production control and replenishment strategy with multiple suppliers.
Eur. J. Oper. Res., 2011

2010
Joint production and supply control in three levels flexible manufacturing systems.
J. Intell. Manuf., 2010

2009
On the integrated production, inventory and preventive maintenance problem in manufacturing systems with backorder.
Int. J. Simul. Process. Model., 2009

Optimisation of the control policy for a stochastic remanufacturing system with an unreliable replacement parts supply.
Int. J. Simul. Process. Model., 2009

2008
Simulating the ERP Diffusion Behavior in Industrial Networks.
Proceedings of the Third International Conference on Software Engineering Advances, 2008

2007
Développement d'une politique intégrée de contrôle des taux de production et de maintenance corrective avec diagnostic.
INFOR Inf. Syst. Oper. Res., 2007

2005
Maintenance scheduling and production control of multiple-machine manufacturing systems.
Comput. Ind. Eng., 2005

2004
Stohastic optimal production control problem with corrective maintenance.
Comput. Ind. Eng., 2004

A simulation optimization based control policy for failure prone one-machine, two-product manufacturing systems.
Comput. Ind. Eng., 2004

Planning tools for managing the supply chain.
Comput. Ind. Eng., 2004

Forward.
Comput. Ind. Eng., 2004

2001
A simulation optimization approach in production planning of failure prone manufacturing systems.
J. Intell. Manuf., 2001

1998
Zone and resource scheduling in remanufacturing systems.
Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, 1998


  Loading...