Alex J. Ruiz-Torres

Orcid: 0000-0002-7528-236X

According to our database1, Alex J. Ruiz-Torres authored at least 33 papers between 1997 and 2023.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
Determining number of suppliers, duration of supply cycle and allocation to in-house production under supply uncertainty.
Comput. Ind. Eng., August, 2023

2022
Scheduling in parallel machines with two objectives: analysis of factors that influence the Pareto frontier.
Oper. Res., 2022

Hybrid two stage flowshop scheduling with secondary resources based on time buckets.
Int. J. Prod. Res., 2022

2021
The Multiple Supply Chain Design Problem: Integration of Multiple Configurations Based on Product, Customer, and Supply Chain Characteristics.
Int. J. Inf. Syst. Supply Chain Manag., 2021

2019
Scheduling workers: A multi-criteria model considering their satisfaction.
Comput. Ind. Eng., 2019

A note on posterior tight worst-case bounds for longest processing time schedules.
4OR, 2019

2018
Scheduling assemble-to-order systems with multiple cells to minimize costs and tardy deliveries.
Comput. Ind. Eng., 2018

2017
Makespan minimisation with sequence-dependent machine deterioration and maintenance events.
Int. J. Prod. Res., 2017

Quality assurance laboratory planning system to maximize worker preference subject to certification and preference balance constraints.
Comput. Oper. Res., 2017

2016
A note on longest processing time algorithms for the two uniform parallel machine makespan minimization problem.
J. Sched., 2016

2015
Partial Solutions and MultiFit Algorithm for Multiprocessor Scheduling.
J. Math. Model. Algorithms Oper. Res., 2015

Maximizing the Percentage of On-Time Jobs with Sequence Dependent Deteriorating Process Times.
Int. J. Oper. Res. Inf. Syst., 2015

2013
Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects.
Comput. Oper. Res., 2013

Supplier selection model with contingency planning for supplier failures.
Comput. Ind. Eng., 2013

2012
A new heuristic for workload balancing on identical parallel machines and a statistical perspective on the workload balancing criteria.
Comput. Oper. Res., 2012

Dynamic Intelligent System for Sourcing Contingency Planning Considering Supplier Failures.
Proceedings of the Sixth UKSim/AMSS European Symposium on Computer Modeling and Simulation, 2012

2011
Minimizing total weighted flowtime subject to minimum makespan on two identical parallel machines.
J. Intell. Manuf., 2011

2010
Parallel machine scheduling problems considering regular measures of performance and machine cost.
J. Oper. Res. Soc., 2010

Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility.
Comput. Oper. Res., 2010

2009
A systematic approach for resource allocation in software projects.
Comput. Ind. Eng., 2009

Minimizing the normalized sum of square for workload deviations on m parallel processors.
Comput. Ind. Eng., 2009

2008
Minimizing the number of late jobs for the permutation flowshop problem with secondary resources.
Comput. Oper. Res., 2008

2007
Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs.
Eur. J. Oper. Res., 2007

Scheduling with flexible resources in parallel workcenters to minimize maximum completion time.
Comput. Oper. Res., 2007

2006
Knowledge based representation and operations assessment of space transportation system architectures.
Knowl. Based Syst., 2006

2005
Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs.
Eur. J. Oper. Res., 2005

2004
Using the FDH formulation of DEA to evaluate a multi-criteria problem in parallel machine scheduling.
Comput. Ind. Eng., 2004

An Integrated Estimation and Modeling Environment for the Design of the Orbital Space Plane.
Proceedings of the 36th conference on Winter simulation, 2004

2003
Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time.
J. Oper. Res. Soc., 2003

2000
Minimizing makespan subject to minimum total flow-time on identical parallel machines.
Eur. J. Oper. Res., 2000

Simulation based operational analysis of future space transportation systems.
Proceedings of the 32nd conference on Winter simulation, 2000

1998
Application of Real-Time Simulation to Assign Due Dates on Logistic-manufacturing Networks.
Proceedings of the 30th conference on Winter simulation, 1998

1997
Simulation Based Approach to Study the Interaction of Scheduling and Routing on a Logistic Network.
Proceedings of the 29th conference on Winter simulation, 1997


  Loading...