Alberto Cano

Affiliations:
  • Universitat Politècnica de Catalunya, Barcelona, Spain


According to our database1, Alberto Cano authored at least 13 papers between 2011 and 2017.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2017
A hybrid dynamic programming for solving a mixed-model sequencing problem with production mix restriction and free interruptions.
Prog. Artif. Intell., 2017

2015
Corrigendum to ''Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules'' [Eur. J. Oper. Res. 210(2011) 495-513].
Eur. J. Oper. Res., 2015

2014
Modelado y resolución de problemas de secuenciación en contexto JIT/DS mediante BDP.
PhD thesis, 2014

2013
Hybrid Procedure Based on Bounded Dynamic Programming and Linear Programming for Solving a Variant of the MMSP-W.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Extended Models for TSALBP with Ergonomic Risk Constraints.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Impact of the Production Mix Preservation on the ORV Problem.
Proceedings of the Advances in Artificial Intelligence, 2013

2012
Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan's Barcelona Plant.
Expert Syst. Appl., 2012

Models for MMSP-W considering workstation dependencies: A case study of Nissan's Barcelona plant.
Eur. J. Oper. Res., 2012

Solving the Fm∣block∣C<sub>max</sub> problem using Bounded Dynamic Programming.
Eng. Appl. Artif. Intell., 2012

Incorporating Regularity of Required Workload to the MMSP-W with Serial Workstations and Free Interruption of the Operations.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

2011
Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules.
Eur. J. Oper. Res., 2011

A bounded dynamic programming algorithm for the MMSP-W considering workstation dependencies and unrestricted interruption of the operations.
Proceedings of the 11th International Conference on Intelligent Systems Design and Applications, 2011

A bounded dynamic programming algorithm for the blocking flow shop problem.
Proceedings of the 2011 IEEE Workshop On Computational Intelligence In Production And Logistics Systems, 2011


  Loading...