Aiying Rong
Orcid: 0000-0002-7247-1026
According to our database1,
Aiying Rong
authored at least 23 papers
between 2000 and 2021.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2021
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2021
2017
An efficient model and algorithm for the transmission-constrained multi-site combined heat and power system.
Eur. J. Oper. Res., 2017
2015
A two phase approach for the bi-objective non-convex combined heat and power production planning problem.
Eur. J. Oper. Res., 2015
2014
Eur. J. Oper. Res., 2014
2013
A reduction dynamic programming algorithm for the bi-objective integer knapsack problem.
Eur. J. Oper. Res., 2013
2012
Computational performance of basic state reduction based dynamic programming algorithms for bi-objective 0-1 knapsack problems.
Comput. Math. Appl., 2012
Appl. Math. Comput., 2012
2011
A two state reduction based dynamic programming algorithm for the bi-objective 0-1 knapsack problem.
Comput. Math. Appl., 2011
2010
OR Spectr., 2010
Monthly tour scheduling models with mixed skills considering weekend off requirements.
Comput. Ind. Eng., 2010
2009
Eur. J. Oper. Res., 2009
2008
Eur. J. Oper. Res., 2008
Fuzzy chance constrained linear programming model for optimizing the scrap charge in steel production.
Eur. J. Oper. Res., 2008
A variant of the dynamic programming algorithm for unit commitment of combined heat and power systems.
Eur. J. Oper. Res., 2008
2007
An efficient envelope-based Branch and Bound algorithm for non-convex combined heat and power production planning.
Eur. J. Oper. Res., 2007
CO<sub>2</sub> emissions trading planning in combined heat and power production via multi-period stochastic optimization.
Eur. J. Oper. Res., 2007
Efficient algorithms for combined heat and power production planning under the deregulated electricity market.
Eur. J. Oper. Res., 2007
2006
An efficient linear model and optimisation algorithm for multi-site combined heat and power production.
Eur. J. Oper. Res., 2006
2001
An effective heuristic algorithm to minimise stack shuffles in selecting steel slabs from the slab yard for heating and rolling.
J. Oper. Res. Soc., 2001
A review of planning and scheduling systems and methods for integrated steel production.
Eur. J. Oper. Res., 2001
2000
A mathematical programming model for scheduling steelmaking-continuous casting production.
Eur. J. Oper. Res., 2000
A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex.
Eur. J. Oper. Res., 2000