Ada M. Alvarez
Orcid: 0000-0002-5796-3452
According to our database1,
Ada M. Alvarez
authored at least 31 papers
between 2004 and 2021.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on zbmath.org
-
on uanl.mx
-
on orcid.org
On csauthors.net:
Bibliography
2021
Two approaches to handle the dynamism in a scheduling problem with sequence-dependent setup times.
Expert Syst. Appl., 2021
Fast and efficient algorithms to handle the dynamism in a single machine scheduling problem with sequence-dependent setup times.
Comput. Ind. Eng., 2021
2019
Oper. Res., 2019
A metaheuristic algorithm and simulation to study the effect of learning or tiredness on sequence-dependent setup times in a parallel machine scheduling problem.
Expert Syst. Appl., 2019
A hybrid metaheuristic algorithm for a parallel machine scheduling problem with dependent setup times.
Comput. Ind. Eng., 2019
2018
Including preventive maintenance activities in an unrelated parallel machine environment with dependent setup times.
Comput. Ind. Eng., 2018
2017
A multi-start algorithm to design a multi-class classifier for a multi-criteria ABC inventory classification problem.
Expert Syst. Appl., 2017
Proceedings of the Smart Cities - Second International Conference, Smart-CT 2017, Málaga, 2017
2015
J. Oper. Res. Soc., 2015
2014
Enhancing variable neighborhood search by adding memory: Application to a real logistic problem.
Knowl. Based Syst., 2014
Appl. Soft Comput., 2014
2013
A multi-start tabu search method for a single-machine scheduling problem with periodic maintenance and sequence-dependent set-up times.
J. Sched., 2013
Bi-objective feature selection for discriminant analysis in two-class classification.
Knowl. Based Syst., 2013
Practice Summary: Enhancing Forecasting and Capacity Planning Capabilities in a Telecommunications Company.
Interfaces, 2013
Minimizing waiting times in a route design problem with multiple use of a single vehicle.
Electron. Notes Discret. Math., 2013
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013
Effect of the Initial Solutions to Balance Routes in Vehicle Routing Problem with Time Windows.
Proceedings of the Advances in Computational Intelligence, 2013
A Reformulation for the Problem of Scheduling Unrelated Parallel Machines with Sequence and Machine Dependent Setup Times.
Proceedings of the Twenty-Third International Conference on Automated Planning and Scheduling, 2013
2012
Optimizing vehicle routes in a bakery company allowing flexibility in delivery dates.
J. Oper. Res. Soc., 2012
Eur. J. Oper. Res., 2012
2011
A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times.
Comput. Math. Appl., 2011
2010
Large-Scale Public R&D Portfolio Selection by Maximizing a Biobjective Impact Measure.
IEEE Trans. Syst. Man Cybern. Part A, 2010
2009
Comput. Oper. Res., 2009
2008
2006
Proceedings of the 16th International Conference on Electronics, Communications, and Computers (CONIELECOMP 2006), 27 February 2005, 2006
2005
Grasp Embedded Scatter Search for the Multicommodity Capacitated Network Design Problem.
J. Heuristics, 2005
2004
Proceedings of the 14th International Conference on Electronics, 2004